The Prefabricated Panel Wall System from TMG
The Prefabricated Panel Wall System offers an efficient and cost-effective alternative to traditional stick framing in construction. This method involves prefabricating wall panels off-site, which are then delivered and assembled at the construction site. By using pre-built panels, the construction process becomes significantly faster, reducing both the timeline and labor required. This system supports the construction of taller buildings—up to eleven stories—without escalating costs.
The process is divided into three phases: design and engineering, fabrication, and installation. Prefabricated panels are built in sequence, shipped in installation order, and swiftly installed, allowing other trades like electrical and plumbing to begin work earlier. This approach not only speeds up project completion but also enhances overall efficiency, saving time and money for all stakeholders involved.